Does longer roster lead-time reduce temporary staff usage? A regression analysis of e-rostering data from 77 hospital units

DRAKE, Robert (2018). Does longer roster lead-time reduce temporary staff usage? A regression analysis of e-rostering data from 77 hospital units. Journal of Advanced Nursing, 74 (8), 1831-1838. [Article]

Documents
18942:407320
[thumbnail of Drake Does longer roster lead-time reduce temporary staff usage.pdf]
Preview
PDF
Drake Does longer roster lead-time reduce temporary staff usage.pdf - Accepted Version
Available under License All rights reserved.

Download (652kB) | Preview
Abstract
Aims Utilisation of temporary nursing staff is contentious and expensive. Using e-rostering data from 77 hospital units, this research investigates whether longer roster lead-times reduce temporary staff usage. Background It is commonly assumed that longer roster approval lead-times, the time from when a roster is approved, to when it is worked, result in better, more cost-effective rosters. Consequently, many hospitals target lead-times of six weeks, a figure recommended for the UK National Health Service (NHS) in a recent governmental review. This contrasts with the minimum lead-time advocated by New South Wales Ministry of Health, which advises a shorter lead-time of two weeks. Using data from 77 hospital units, this paper explores this assumed relationship. Design Using data extracted from the e-rostering system of an NHS Acute Foundation Trust, this study uses linear regression analysis to explore the relationship between roster approval lead-time and temporary staff usage. The data were captured over a period of nine months from 15th February 2016 to 23rd October 2016, a total of 693 rosters. Results/Findings This research suggests that late roster approval may contribute to as much as 37% of temporary staff usage, while approval 4-6 weeks prior to the roster being worked reduces this to approximately 15%. However, this is only relevant under specific conditions. Importantly, this should be considered before mandating lead times across all units. Conclusions This research implies that the optimum approval lead-time lies between four to six weeks, however, given other challenges, achieving this in practice may prove difficult.
More Information
Statistics

Downloads

Downloads per month over past year

View more statistics

Metrics

Altmetric Badge

Dimensions Badge

Share
Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email

Actions (login required)

View Item View Item